Any two-Tale addition on existing footers will require an engineer to verify that the present footer is satisfactory, or to generate suggestions as to what's going to be necessary to have the additional load, signed and sealed.I’m on the lookout ahead towards the time arising and can’t wait around to get to work with the remainder of the team�